首页 / 专利库 / 道路 / 压实 / A CONCRETE BATCHING PLANT HAVING REDUCED CYCLE TIME AND REDUCED INSTALLATION AND DISMANTLING TIME

A CONCRETE BATCHING PLANT HAVING REDUCED CYCLE TIME AND REDUCED INSTALLATION AND DISMANTLING TIME

阅读:918发布:2023-12-28

专利汇可以提供A CONCRETE BATCHING PLANT HAVING REDUCED CYCLE TIME AND REDUCED INSTALLATION AND DISMANTLING TIME专利检索,专利查询,专利分析的服务。并且A method of operating a concrete batching plant comprises: - loading aggregates comprising sand and stones into aggregate storage bin (2), divided into different compartments, from the ground level by wheel loader (1); - discharging the material from storage bins (2) by gravity through batching gates (3) fitted at their bottom into a weighing hopper (5); - lifting the aggregates after being weighed in the weighing hopper (5) from 2 mtrs to 3 mtr - 3.5 mtr. above the ground level hydraulically (8); - simultaneously conveying cement through screw conveyor (12) into a Cement weigher (11) and discharging the same into mixer (9); - mixing and compacting of the aggregates, which are cement, water and chemicals, for a pre-determined time; - discharging the mixed and compacted concrete into a concrete carrying hopper (15); - transporting the concrete carrying hopper (15) with the concrete to desired height either lifted hydraulically on rail (16), rack and pinion or rope arrangement; and - loading the concrete into mobile transit mixer (18) or concrete pump, based on the site requirement.,下面是A CONCRETE BATCHING PLANT HAVING REDUCED CYCLE TIME AND REDUCED INSTALLATION AND DISMANTLING TIME专利的具体信息内容。

高效检索全球专利

专利汇是专利免费检索,专利查询,专利分析-国家发明专利查询检索分析平台,是提供专利分析,专利查询,专利检索等数据服务功能的知识产权数据服务商。

我们的产品包含105个国家的1.26亿组数据,免费查、免费专利分析。

申请试用

分析报告

专利汇分析报告产品可以对行业情报数据进行梳理分析,涉及维度包括行业专利基本状况分析、地域分析、技术分析、发明人分析、申请人分析、专利权人分析、失效分析、核心专利分析、法律分析、研发重点分析、企业专利处境分析、技术处境分析、专利寿命分析、企业定位分析、引证分析等超过60个分析角度,系统通过AI智能系统对图表进行解读,只需1分钟,一键生成行业专利分析报告。

申请试用

QQ群二维码
意见反馈