序号 专利名 申请号 申请日 公开(公告)号 公开(公告)日 发明人
221 소음 저감형 지하 천공용 함마드릴 KR1020110030986 2011-04-05 KR1020120113330A 2012-10-15 유영생; 한능섭
PURPOSE: A hammer drill for drilling underground with low-noise is provided to remarkably reduce operation noise caused by excavation by using air pressure compressed in a compression chamber. CONSTITUTION: A hammer drill(100) for drilling underground with low-noise comprises a compression chamber. The compression chamber is arranged on the inner diameter of an outer sleeve(30) touching a hammer bit(50) and a piston(40). The compression chamber is composed of an outer cylinder(54a) and an inner cylinder(54b). The outer cylinder has an inner diameter in which the outer diameter of the piston is inserted and is inserted into the outer sleeve. The inner cylinder is installed on the top end of an air exhaust hole(51) of the hammer bit and has an outer diameter which can be inserted into the inner diameter of the piston.
222 air mattress for preventing soil erosion, system and method for preventing soil erosion in using same KR20120026349 2012-03-15 KR101172776B1 2012-08-14 LEE JIN YOUNG; LIM JAE SOO; KIM JU YONG; YANG DONG YOON
PURPOSE: An air mattress for preventing soil leakage, a system and a method for preventing soil leakage using the same are provided to prevent environmental contamination by preventing soil leakage using a casing and an outflow prevention wall. CONSTITUTION: An air mattress for preventing soil leakage comprises a casing(200), an outflow prevention wall(110), and a soil discharge pipe(130). The casing covers a hammer bit(310) of a drill and firstly prevents soil leakage. The outflow prevention wall is formed along the edge of the casing and secondly prevents soil leakage by covering the casing. The soil discharge pipe is formed on the side surface of the outflow prevention wall and discharges waste stored in the inner side of the outflow prevention wall to the outside.
223 지반 굴착장비의 안전 스커트 KR1020110028976 2011-03-30 KR101074242B1 2011-10-14 이규철
본 발명은 지반 굴착을 위한 케이싱 작업 중 항타 장비를 이동하거나, 케이싱 하부에서 작업을 할 때 케이싱이 아래로 떨어지는 것을 막아주는 안전 스커트에 관한 것이다.
본 발명은 지반 굴착시 케이싱을 지반에 시공하는 케이싱 공법에서 케이싱이 연결되는 스커트의 키 홀에 홀 메움 키를 설치하여, 케이싱의 키가 스커트에 있는 키 홀의 중앙홀을 통해 아래로 빠지는 것을 효과적으로 막을 수 있는 새로운 형태의 안전장치를 구현함으로써, 항타 설비의 이동시 또는 케이싱 하부 작업시 등과 같은 작업 상황에서 진동이나 충격 등에 의해 케이싱이 낙하되는 문제를 완전히 배제할 수 있고, 이에 따라 안전 사고의 위험을 미연에 방지할 수 있는 안전 스커트를 제공한다.
224 천공기용 소음방지장치 KR1020090119355 2009-12-03 KR1020110062586A 2011-06-10 송훈; 김대수; 유제승
PURPOSE: A noise prevention device for a boring machine is provided to cut off noise caused by drill work effectively and to prevent the scatter of dust at drill work. CONSTITUTION: A noise prevention device(100) for a boring machine comprises: a cover unit(110) covering a leader and a driving rod to cut off noise caused by drill work and including a frame, a soundproofing material attached to the inside of the frame, a sound absorbing material attached to the inside of the soundproofing material, and a filler placed on the inside of the sound absorbing material; and a dust suction unit installed to the bottom of the cover unit to inhale and remove dust caused by drill work and including a suction frame(121) formed on the lower part of the cover unit and a suction pipe(123) extended from the suction frame.
225 천공장비 부토비산 방지망 KR1020090089111 2009-09-21 KR1020110031738A 2011-03-29 심재위; 김교정; 방현식
PURPOSE: A drilling machine cover for preventing flying soil from scattering is provided to prevent the beauty around construction area from being spoiled by a screw since the screw of a drilling machine is covered by a dustproof cloth. CONSTITUTION: A drilling machine cover for preventing flying soil from scattering comprises a dustproof cloth(10), a transverse cover, an arc ring, a lower Velcro, an upper Velcro, a connection ring(41), and a connection latch(42). The dustproof cloth has a rectangular shape. The transverse cover is coupled with the inner surface of the dustproof cloth in the transverse direction. One side of the arc ring is opened, and the length thereof is equal to the width of the dustproof cloth. The lower Velcro is fixed to the bottom of the dustproof cloth in the transverse direction. The upper Velcro is coupled with the lower Velcro. The connection ring connects the upper and lower dustproof cloths. The connection latches connect to the connection rings, respectively.
226 천공 장치 KR1020090085513 2009-09-10 KR1020110027429A 2011-03-16 정재만
PURPOSE: A boring machine is provided to improve the efficiency of underground boring work, since working time is reduced by the connection and separation of drill rods. CONSTITUTION: A boring machine comprises a lead, a head portion(30), a bit unit, a tool clamping unit(40), a rod cartridge unit. The lead is installed in the main body of a borer. The head portion is installed in the lead to be slidable and is moved up and down by a lifting device. The head portion has a driving shaft(31) combined with one or more drill rods which connect to each other. The bit unit is installed at the end of the drill rod coupled with the driving shaft. The tool clamping unit is installed in the lead and clamps the drill rod to couple and separate the drill rods. The rod cartridge unit is installed to be adjacent to the lead, supports the drill rods, supplies the drill rods, and collects the drill rods.
227 로터리 드릴링 리그 KR1020090005652 2009-01-22 KR100942174B1 2010-02-12 이상태; 부해룡; 강준구; 이상식; 박성호
PURPOSE: A rotary drilling rig is provided to reduce excavation time by preventing the locking defect of multi-stage Kelly-bars. CONSTITUTION: A rotary drilling rig(1000) comprises a base machine(100), a mast(200), a first winch(300), a Kelly-bar assembly(400), a first wire winding amount measuring device(500), a second winch(600), a Kelly-bar drive unit(700), a second wire winding amount measuring device(800), and a location production unit. The base machine provides fluid pressure to the first winch, the Kelly-bar assembly, the second winch, and a Kelly-bar drive unit. The base machine collects the fluid pressure from the first winch, the Kelly-bar assembly, the second winch, the Kelly-bar drive unit. The base machine transfers the mast. The base machine comprises a control booth. An operator is able to control all functions of the rotary drilling rig through the control booth.
228 토사막이가 구비된 오거장치 KR1020090072474 2009-08-06 KR100937382B1 2010-01-18 박동식
PURPOSE: An auger system with a soil barrier is provided to improve durability by blocking soil flowed through a gap between the inner surface of a rotary body and the outer surface of an inner casing. CONSTITUTION: An auger system with a soil barrier(100) comprises an auger(110), an outer casing(120), an inner casing(130), and a soil barrier device(200). The auger excavates the ground(G) by being inserted into the ground by an auger motor(112). The outer casing extended for covering the auger is connected to casing rotating motors(122a,122b) through a rotary body(140) and rotated in an opposite direction with the auger. The inner casing arranged inside of the rotary body for covering the auger guides soil(S) discharged by the auger to the upper side. The soil barrier device arranged in a gap between the inner surface of a rotary body and the outer surface of the inner casing blocks the soil flowed to the gap when the ground is excavated by the auger.
229 굴착기 KR1020080031769 2008-04-04 KR1020090106207A 2009-10-08 백남진
PURPOSE: An excavator is provided to prevent shaking of the bit and to improve quality of the excavated hole. CONSTITUTION: An excavator(100) comprises a driving part, a driving shaft(110), a bit(120), and a guide(130). The driving part generates a driving force for excavation work. The driving shaft is combined with the driving part and delivers the driving force of the driving part. The bit is installed on an end of the driving shaft and provided with the driving force of the driving part to form an excavated hole(210) on a ground(200). The guide is installed on the bit or the bit side driving shaft to keep the bit and the excavated hole concentric, and slides on the excavated hole.
230 중장대한 리다의 기울기 조정방법과 그 구성장치 KR1020060004684 2006-01-16 KR1020070075919A 2007-07-24 이시영
A method for regulating the inclination of a heavy leader is provided to regulate the inclination of a leader regularly within the fixed range and to keep the regulated inclination of a leader continuously. The method for regulating the inclination of a heavy leader comprises the steps of supporting the upper part of a leader(D) with a boom and a support using a multi-directional connector which moves in all directions to connect an object and an object, connecting the lower part of the leader with the upper part of the leader using a leader connector and supporting a fixed plate(C) of equipment projected from a body of construction equipment to share the weight of the leader with the support, the boom and the fixed plate, and regulating the inclination of the leader with an inclination regulator which regulates an inclination by a cam(28) rotated by a rotary shaft(29) installed on the fixed plate.
231 중장대한 리다의 기울기 조정장치 KR2020060005892 2006-03-05 KR200421324Y1 2006-07-12 이시영
건설 공사에서 파일 또는 구멍을 시공하는 항타 또는 천공장비의 리다의 기울기를 조정장치에 관한 고안이다. 리다를 기계적으로 장비의 본체와 분리시킨 후, 지지대(H)나 붐대에 연장되어 전방으로 돌출되게 설치된 고정판(C)과 장비(A)의 본체의 하부에서 전방으로 돌출된 또 하나의 고정판(캣치후크)을 관통하는 자세로 거치시키고, 두 고정판 중의 하나에 장치된 전후좌우로 기우면서도 리다(D)의 중량을 지지하는 4방향 지지대(90)로는 리다를 받치고, 또 하나의 다른 고정판에 장치된, 수동 또는 콘트롤라의 지시에 따라 구동하는 회전장치에 의해 작동하고 캠이나 와이어가 장치된 회전축으로 리다를 전후 좌우로 변위시키는 4방향 기울기 조정장치(20)로는 리다의 기울기를 조정하는 중장대한 리다의 기울기 조정장치에 관한 고안이다. 리다, 회전축, 지지대, 천공장비, 기울기
232 발파공용 비트의 안내장치 KR2020050004038 2005-02-15 KR200384091Y1 2005-05-11 김은관
본 고안은 발파공용 비트를 안내하기 위한 장치로서, 점보드릴 등에 구비된 착암기에 연결되며, 상부에는 상기 착암기의 로드가 소통하도록 함몰부가 형성되고 측부에는 다수의 체결홀이 형성된 몸체; 상기 몸체의 전면 중앙부에 고정되며, 상기 착암기의 로드와 연결되는 천공용 비트 및 노치형성용 비트의 진행 경로를 안내하는 안내부; 및 상기 몸체의 전면 하부에 고정되며, 작업 대상물에 접촉되어 상기 몸체를 안정적으로 지지하는 지지부를 포함해서 이루어진 안내장치를 통해 점보드릴 등에 구비된 착암기에 연결된 천공용 비트 및 노치형성용 비트를 적절히 안내하여 원하는 발파공 및 노치를 손십게 형성할 수 있도록 된 것이다.
233 굴착기의 분진방지 및 안전사고 방지장치 KR1020030075168 2003-10-27 KR1020050040138A 2005-05-03 한동덕; 전종현
본 발명은 빌딩등의 건축공사를 하기 위한 굴착기(1)에 덮개(8)를 구성함으로써 지반천공시 발생되는 토사 및 먼지의 확산을 방지할 수 있고, 굴착기의 오거(3)를 지반으로부터 뽑아올릴 때 오거(3)의 스크류(16)에 잔류하는 암석등이 추락하여 작업자가 부상을 당하는 안전 사고를 미연에 방지할 수 있는 굴착기(1)의 분진방지 및 안전사고 방지장치에 관한 것이다. 본 발명에 의한 굴착기(1)의 분진방지 및 안전사고방지장치는 덮개고정체(9)에 원뿔형태의 덮개(8)가 구성되고, 덮개고정체(9)의 양측에 형성된 체결구(12)는 지지체(10)의 양측에 형성된 체결구(12)에 결합되어 결합핀(13)을 체결구(12)의 결합핀삽입홀(14)에 삽입하여 덮개고정체(9)를 지지체(10)에 고정하며, 지지체(10)의 일측에 형성된 한 쌍의 고정밴드(11)가 굴착기(1)의 리더(7)에 고정하도록 구성된다.
234 천공장비용 집진장치 KR2020030028215 2003-09-02 KR200333705Y1 2003-11-17 박주천
본 고안은 채광 등을 위해 암석에 천공작업을 행할 때에 사용되는 천공장비에 관한 것으로서, 특히 드릴 비트의 단부에 설치되어 천공 부위에서 발생되는 분진은 흡입하고, 비교적 큰 돌멩이들은 외부로 배출되도록 함으로써 돌멩이가 유입으로 발생되는 오작동 및 파손을 방지하고, 대기 오염을 예방할 수 있도록 한 천공장비용 집진장치에 관한 것이다. 본 고안에 따른 천공장비용 집진장치는 대차와, 착공기와, 상기 착공기와 대차 사이에 설치되어 착공기의 위치를 제어하도록 하는 경사조절수단이 포함된 천공장비에 있어서, 상기 착공기의 단부에 설치되어 천공작업 시에 발생되는 먼지 및 분진이 공기 중으로 확산되는 것을 방지하고 단부가 다수 개로 절개되어 빗살 모양을 이루는 밀착부가 형성되어 다양한 각도의 경사면에 대응되도록 하는 덮개와, 상기 덮개의 내부와 연통되도록 설치되어 먼지 및 분진이 덮개 외측으로 안내되도록 하며 배치되는 각도 및 길이가 가변되는 주름관과, 상기 주름관의 단부에 설치되어 덮개 내부의 먼지 및 분진을 흡입토록 하는 집진기가 포함된 것을 특징으로 한다.
235 건축공사용 굴착기의 헤드 KR2020000010908 2000-04-18 KR200199313Y1 2000-10-02 정영대
본 고안은, 구동축관(50)과, 상기 구동축관과 조립되는 플랜지 (20)에 연결된 관체(18)과, 상기 관체(18)과 일체로 조립된 케이싱(10)과, 상기 플랜지의 하방에 형성되며 내경쪽에는 다수의 구멍(23)들이 형성된 고압공기진입실(22)과, 상기 케이싱의 저면에 형성된 하나의 구멍과 상기 플랜지에 형성된 고압공기진입실(22)의 내경쪽을 연결하는 흡입관(19)과, 상기 케이싱의 저면에 수평으로 구성되는 다수의 비트(70)들로 조합된 건축공사용 굴착기의 헤드에 있어서, 상기 케이싱의 내부에 적층된 채 볼트(15)와 너트(16)에 의해 고정되어 헤드 전체의 중량을 증가시키기 위한 무게추(14)들과; 상기 무게추들과 케이싱의 측벽 사이에 공간부를 형성시키고 이 공간부를 통해서 물이 비트 쪽으로 공급되도록 하기 위한 장방형의 구멍(11)들과; 굴착시 헤드의 센터링이 어긋나지 않도록 상기 케이싱의 저면에 고정되는 비트(70)들은 'W'자 형태의 굴곡을 이루도록 높낮이가 형성된 것을 포함하여서 구성됨을 특징으로 하는 건축공사용 굴착기의 헤드를 제공한다.
236 건축공사용 굴착기의 헤드 KR1019990036023 1999-08-25 KR1019990083903A 1999-12-06 정영대
본발명은건축공사용굴착기의헤드에관한것으로, 종래에비해굴착구멍이무너지는현상과센터링의불량현상등이소멸되어생산성과작업성및 경제성등이우수한특징을가진다. 이를위하여본 발명은, 구동축관 50과, 상기구동축관과조립되는플랜지 20에연결된관체 18과, 상기관체와일체로조립된케이싱 10과, 상기플랜지의하방에형성되며내경쪽에는다수의구멍 23들이형성된고압공기진입실 22와, 상기케이싱의저면에형성된하나의구멍과상기플랜지에형성된고압공기진입실 22의내경쪽을연결하는흡입관과, 상기케이싱의저면에수평으로구성되는다수의비트 70들로조합된건축공사용굴착기의헤드에있어서, 상기케이싱의내부에적층된채 볼트 15와너트 16에의해고정되어헤드전체의중량을증가시키기위한무게추 14들과; 상기무게추들과케이싱의측벽사이에공간부를형성시키고이 공간부를통해서물이비트쪽으로공급되도록하기위한장방형의구멍 11들과; 굴착시헤드의센터링이어긋나지않도록상기케이싱의저면에고정되는비트 70들은 "W"자형태의굴곡을이루도록높낮이가형성된것을포함하여서구성됨을특징으로하는건축공사용굴착기의헤드를제공한다.
237 오거굴착기용 케이싱유닛 KR1020130094611 2013-08-09 KR101439785B1 2014-09-12 이종희
The present invention relates to a casing unit for an auger type excavator. More specifically, a brake controlling the rotation of planetary gears is installed on one side of a speed reducer of the auger type excavator to which the planetary gears having different deceleration rates are connected in a stepping manner. A casing member to prevent the ground from collapsing is directly installed in the planetary gear units by being connected through a casing clamp, hence the rotational speed of the casing member is freely adjusted in response to the deceleration of rotation of the planetary gear units by the operation of the brake. The present invention comprises a sun gear, a planetary gear, and a ring gear.
238 분진 차단장치 KR1020130017546 2013-02-19 KR101434088B1 2014-08-25 이영균; 이상현
Disclosed is a dust preventing device. The dust preventing device is installed around a striking device of a pile driver to prevent the diffusion of the dust generated when a pile is struck. The dust preventing device comprises a first frame; a second frame separated from the first frame at a predetermined interval and positioned under the first frame; and a dust preventing film having the upper part fixed to the first frame and the lower part fixed to the second frame and preventing the dust by surrounding the striking device of the pile driver. If the dust preventing device is used, a plurality of dust preventing devices can be easily connected in the longitudinal direction of the pile driver when being installed in the pile driver. Therefore, the installation to the pile driver is to be simple. Moreover, transport and storage are convenient as the dust preventing device can be folded.
239 천공장비용 마스트 KR1020110131242 2011-12-08 KR1020130064565A 2013-06-18 황운규; 박종호
PURPOSE: A mast for a boring device is provided to easily arrange a structure in inner space of a mast body and to improve rigidity by covering an opening unit of the mast body with a reinforcement plate in needs. CONSTITUTION: A mast(100) for a boring device comprises a mast body(110), a first bead(120), and a reinforcement plate(140). The mast body includes space capable of installing a structure inside and is formed as a U shape including an opening unit in the upper end. The first bead is individually and separately arranged in upper right and left ends of the mast body and is supported by being wrapped by a cradle(150). The reinforcement plate reinforces the mast body by covering the upper part of the mast body.
240 천공작업의 가이드장치 KR1020100132900 2010-12-22 KR1020120071237A 2012-07-02 한상우
PURPOSE: A guide device for a boring work is provided to prevent a boring path from becoming bent even if the guide device meets a bedrock layer during a boring work. CONSTITUTION: A guide device for a boring work comprises a pair of side wall members(100), multiple guide members(200), and support members(300). The side wall members have multiple guide member mounting parts(110) in a longitudinal direction. The guide members are installed in the guide member mounting parts. The support members support the side wall members. A casing(10) for a boring work is inserted into the area formed by the side walls and the guide members.