首页 / 专利库 / 建筑材料 / 建筑材料 / 土工合成材料 / Chipping work for head of in-situ pile

Chipping work for head of in-situ pile

阅读:578发布:2022-11-24

专利汇可以提供Chipping work for head of in-situ pile专利检索,专利查询,专利分析的服务。并且PURPOSE: To curtail the cost of labor as well as shorten the period of construction by a method in which an in-situ pile is constructed under a condition that a covering film is beforehand spread over the periphery of main reinforcing bars positioned on the chipping level of the pile head, and the head of the pile is broken by an oil-pressure packer.
CONSTITUTION: The periphery of main reinforcing bars 3 positioned on the chipping level of the pile head in the upper end portion of a reinforcing bar cage 2 inserted into an excavated pit 1 is covered with a covering material 4 of synthetic resin tube or tape. Concrete 5 is then placed into the pit 1 and hardened, and pits 7 are then provided in the side of nearby pile 5A where the lower end of the covering material 4 is positioned. A wedge-type oil-pressure packer 8 is inserted into the pits 7 and operated to break the pits 7, and the pit head concrete 5B is then lifted up by using a hanging ring 9.
COPYRIGHT: (C)1987,JPO&Japio,下面是Chipping work for head of in-situ pile专利的具体信息内容。

高效检索全球专利

专利汇是专利免费检索,专利查询,专利分析-国家发明专利查询检索分析平台,是提供专利分析,专利查询,专利检索等数据服务功能的知识产权数据服务商。

我们的产品包含105个国家的1.26亿组数据,免费查、免费专利分析。

申请试用

分析报告

专利汇分析报告产品可以对行业情报数据进行梳理分析,涉及维度包括行业专利基本状况分析、地域分析、技术分析、发明人分析、申请人分析、专利权人分析、失效分析、核心专利分析、法律分析、研发重点分析、企业专利处境分析、技术处境分析、专利寿命分析、企业定位分析、引证分析等超过60个分析角度,系统通过AI智能系统对图表进行解读,只需1分钟,一键生成行业专利分析报告。

申请试用

QQ群二维码
意见反馈