首页 / 专利库 / 风能 / 山丘效应 / Formation of building site

Formation of building site

阅读:312发布:2020-05-21

专利汇可以提供Formation of building site专利检索,专利查询,专利分析的服务。并且PURPOSE: To increase shearing intensity of a sediment, so as to prevent landslide when an artificial hill is formed by banking so as to cover a public system, by laying a geotextile between the respective bankings, and utilizing an interlock effect.
CONSTITUTION: After a public system S such as a road 5 or a railroad 6 is laid on a ground surface G, a ground on the side of the public system S is dug up so as to form a recessed part 9, and the excavated sediment is raised around the public system S as a banking 11. After a net-shaped geotextile 10 is laid so as to cover the upper part of the banking 11, a banking 12, a geotextile 13, and a banking 14 are further laid thereupon for finishing. Due to the elevation of an interlock effect between the banking 12 and the geotextile 10, shearing intensity of the sediment is increased, whereby landslide of a banking can be prevented.
COPYRIGHT: (C)1991,JPO&Japio,下面是Formation of building site专利的具体信息内容。

高效检索全球专利

专利汇是专利免费检索,专利查询,专利分析-国家发明专利查询检索分析平台,是提供专利分析,专利查询,专利检索等数据服务功能的知识产权数据服务商。

我们的产品包含105个国家的1.26亿组数据,免费查、免费专利分析。

申请试用

分析报告

专利汇分析报告产品可以对行业情报数据进行梳理分析,涉及维度包括行业专利基本状况分析、地域分析、技术分析、发明人分析、申请人分析、专利权人分析、失效分析、核心专利分析、法律分析、研发重点分析、企业专利处境分析、技术处境分析、专利寿命分析、企业定位分析、引证分析等超过60个分析角度,系统通过AI智能系统对图表进行解读,只需1分钟,一键生成行业专利分析报告。

申请试用

QQ群二维码
意见反馈