专利汇可以提供A TUNNELING MACHINERY AND A METHOD OF PROVIDING A CONCRETE TUNNEL BASE专利检索,专利查询,专利分析的服务。并且A device for pouring concrete in a bottom section of a tunnel enclosed in a tunnel lining, comprising a pouring platform , a concrete receiving and pumping platform (18), a plurality of trailers (40) arranged in a row between said placing platform and said concrete receiving and pumping platform (18). Each trailer (40) comprises a support (46) for a concrete pipeline (22) extending from the concrete receiving, pumping platform (18) to the pouring platform, wherein said concrete receiving and pumping platform (18), said trailers (40) and said placing platform are connected to each other to form a train (10) and are supported by wheels engaging said tunnel lining. Propelling means are arranged to propel said train with said placing platform leading.,下面是A TUNNELING MACHINERY AND A METHOD OF PROVIDING A CONCRETE TUNNEL BASE专利的具体信息内容。
The invention relates to a method and a device for placing concrete in a bottom section of a tunnel enclosed in a tunnel lining, comprising a placement and finishing platform.
Different methods and machines are used for the construction of tunnels. A commonly used type of machine is a tunnel boring machine (TBM). A TBM normally has a circular cutting head that is used to excavate material, which is then transported away from the cutting head on conveyors. After excavating the tunnel profile for a given length of tunnel (an advance) a ring comprising of several segments is installed, thus creating a permanent tunnel lining. The tunnel lining is required to retain ground and water pressure and to provide an internal surface appropriate to the function of the tunnel. In many tunnels, the bottom (invert) is then filled with concrete to provide a base. This may be to form a roadway, or support rail for a train. Concrete is delivered to the workface using several different methods including; concrete truck or re-mixer, pipeline, skips, conveyors and dump trucks. The direction of placement is usually towards the source of supply. This may be a tunnel portal, shaft or cross passage. In other words, if concrete is being supplied from one end of the tunnel, the concrete placement and thus invert forming would commence at the opposite end of the tunnel and the pour(s) would progress towards the end where the concrete is being supplied.
In long tunnels there are numerous problems relating to transporting the concrete to the location of placement. Normally, concrete trucks travel through in the invert yet to be set up. Such traveling prevents complete preparation of the pour area .This includes but is not limited to -segment cleaning, crack repairs, invert drainage, catch pit, crack inducer and UTX installation, and the installation of any other cast-in items.
In accordance with the invention, concrete is delivered by re-mixer (agitator) to a pump mounted on a platform. It is then pumped along a pipeline supported on a plurality of platforms and trailers to a placement platform where it is discharged into the invert through a flexible hose and processed by a finishing platform to form a finished base. This series of platforms and trailers forms a train which has an overall length great enough for the concrete to gain sufficient strength to allow transit of the agitator. The pump platform, trailers and the placement and finishing platforms are supported on primary beams which have wheels mounted at an inclined angle (radially) to run on the tunnel lining.
The primary beams span across the invert, parallel to the plane of the finished base allowing the train to move above the freshly placed concrete. Given that all elements of this train move together, there is no need to alter the length of pipe line as the pour progresses. By continuously moving the system towards the front, forward placement is achieved and the tunnel invert can be placed in the direction away from the source of supply.
The pouring process can be continuous because the length of the train is sufficient for the concrete to cure before any piece of equipment imparts load on it. The required length of the system is dependent on thestrength gains of the concrete, which is a function of temperature, time and mix design. This strength gain is a limiting factor on a maximum placement speed, however, changes to the mix design can offset these limits. The combination of platforms and trailers is flexible depending on the task required. Given the direction of placement, the invert preparation works can proceed unaffected by the placement operation. The entire invert can be set up prior to placement commencing or in parallel with the placement operation.
In accordance with the invention concrete is received at a first end of the train (the rear), pumped along different platforms and trailers of the train and then placed and compacted at a second end of the train (the front). The front platform (placement platform) is used to pour and compact the concrete received through the concrete delivery pipeline and to screed the concrete to the correct elevation. A finishing platform behind this, can be used to accurately finish the concrete and apply a retarder and other surface additives. The placement platform comprises a front screed that is able to travel back and forward along a guide rail, independently of the train. This front screed or primary screed is lowered to a starting position and then moved forward a predetermined distance thus completing a first pass. Then the front screed is raised off the concrete and if required, moved back to the starting position and the above step is repeated. Depending on the circumstances, there could be a requirement to do multiple passes until the level is correctly set. However one pass usually is sufficient.
Depending on the nature of the task, the finishing platform may contain a second screed (re-screed) which is there to make sure the concrete is cast to the exact position. Given that finishing platform is some distance from where the concrete is being discharged, this concrete has stiffened up a little bit by the time the second screed reaches it, and thus a re-screed is effective at correcting any concrete settlement post initial screeding, especially where wet mixes and steep cant's are encountered. This screed can cut and fill the concrete to the exact elevation. As the concrete is a little stiffer here, it will not tend to slump after re-screeding. In various embodiments first and second screed can be moved independently of the train. As a result it is possible to accurately control the screeding speed and the number of passes.
In various embodiments the elevation of the screeds can be controlled by adjustable screed rails previously installed in the tunnel lining to mark the correct concrete level. The screed may comprise a first screed element and a second screed element. A first screed element is used to smooth the concrete while a second screed element further adjusts the concrete level to near perfection. An alternative to this is a mechanically operated, electronically guided screed which eliminates the need for screed rails and aids to reduce labour requirements. The finishing platform is also used to accurately finish and treat the freshly screeded concrete surface. Operations such as floating and towelling can be undertaken either remotely by using pole or rope operated equipment, or using hand tools working off access platforms suspended above the concrete. Once the required finish is obtained, surface additives such as retarder or curing compounds can be applied using a pressure spray unit connected to a storage tank toward the rear of the train. This retarder is used where an exposed aggregate finish is required. Other alternatives may be dry shake additives and toppings.
At the rear of the train are platforms containing the necessary equipment and power sources required to operate the system. Included in this is a jet wash, vacuum unit and retarder storage tank needed to achieve a green cut, exposed aggregate finish.
In order that the manner in which the above recited and other advantages and objects of the invention are obtained will be readily understood, a more particular description of the invention briefly described above will be rendered by reference to specific embodiments thereof which are illustrated in the appended drawings.
Understanding that these drawings depict only typical embodiments of the invention and are not therefore to be considered to be limiting of its scope, the invention will be described and explained with additional specificity and detail through the use of the accompanying drawings in which:
In the embodiment shown in
In the train 10, the pump platform 18 is followed by at least one machinery deck 24. The machinery deck(s) 24 contains slurry tanks 26 for wastewater and solids generated by jet washing. Slurry from the slurry tanks 26 is pumped through a slurry return hose 28 back to an empty dump truck 12 tanker or an agitator. The machinery deck 24 further contains a heavy duty vacuum unit 30 and a jet wash unit 31 used for concrete green cutting. The heavy duty vacuum unit 30 is used for recovering waste water and solids from the green cutting process. The jet wash unit is used to provide an exposed aggregate finish and also to keep the machinery clean. Tanks 32 supply fluids to the second end of the train through pipelines running along platforms and trailers. These fluids may include curing compounds and retarders
In the embodiment shown in
In the train 10 the machinery deck 24 is followed by at least one trailer 40. The necessary length required for the concrete to gain sufficient strength to allow transit of the agitator and other such equipment, determines the number of trailers 40. The trailers 40 support the concrete pipeline 22 and also other pipelines and lines for compressed air, power, retarder, curing compound, and water.
The second inner end (the front) of the train 10 comprises a finishing platform 42A and a placement platform 42B. The placement platform 42B provides access for placement and compaction of the fresh concrete to fill a tunnel invert 17. Concrete is discharged through a flexible hose suspended from an overhead boom and compacted with immersion vibrators. The working decks also enable the primary screed to be operated to give an initial concrete elevation. In various embodiments the placement platform 42B and the finishing platform 42A are combined to a placement platform 42. All platforms and trailers are provided with wheels 44 arranged on cross beam assemblies, c.f.
Each platform has a length of 3-7 meters and each trailer 40 has a length of 8-12 meters. Using five trailers 40 the total length of the train 10 would be 80-100 meters. The train is driven forward at a typical speed of 5 meters per hour. As a result more than 120 meters of tunnel invert slab can be produced each 24 hours. The total length of the train and the speed of the train will ensure that the concrete is sufficiently cured when any equipment imparts load on the newly placed concrete. Significant increases in speed can be achieved through improving concrete supply speeds and through altering the mix design.
In the embodiment shown in
In operation each screed in a first step is moved to and lowered to a starting position. Then in a second step the screed is moved forward to an end position to complete one pass. The primary screed 50 operates between starting position A and end position B, while rear screed operates between starting position C and end position D. The screeds 50, 52 comprise a blade that acts as a straight edge to cut the fresh concrete to the correct profile, an auger that distributes the concrete evenly along its length and a float that leaves a smooth flat finish. In addition the screed may vibrate to aid in compaction. Each screed is supported by a pair of vertically mounted hydraulic rams 58 which extend and retract to control the screed's vertical position throughout the pass. The extension of each ram and hence vertical position of the screed, is electronically controlled through a receiver 62 which receives a signal from a static Total Station (or similar device) 63, c.f.
Both hydraulic rams 58 are connected to a headstock that is mounted within a rack or guiding channel 60 which extends between guide channel supports or posts 64. A chain or hydraulic drive acts to move the screed horizontally backwards and forwards. The distance between position A and position B is around 3 meters, such as between 2 and 4 meters. In various embodiments said distance is approximately 2.4 meters.
The primary screed 50 is then raised off the concrete and moved back to starting position A for repeating the first step. Depending on different conditions such as water content of concrete multiple passes may be required to obtain the correct elevation of the base. The concrete preferably is flowable to facilitate pumping from the pump platform forward to the pouring platform through the concrete pipeline. After first screeding the concrete can slump or shift, especially when there is a significant cross fall or cant on the slab.
The rear screed 52 is operated in a similar manner to avoid problems of the concrete level and to get a very accurate position of the tunnel base 16. Normally, the concrete will have stiffened up when the rear screed 52 cuts and fills the concrete to the desired level. Also the rear screed 52 may require two or more passes.The rear screed 52 moves in a horizontal direction between position C and position D.
When the fresh concrete is placed by the operatives, it is left slightly high of the finished elevation so that the primary screed can strike off the excess. This excess will be pushed forward into the invert ahead. Men may be required to rake the concrete to position ahead of this screed. Given that the secondary screed acts only to finely adjust the already screeded concrete should it have shifted, it does not tend to produce an excess but instead, redistributes it to the correct elevation along the screed beam. To this end, the direction of the auger on the screed can be reversed to help bring the concrete back up the slope where steep cants are encountered
The backwards and forwards motion of primary screed 50 and rear screed or re-screed 52 can be provided by a chain drive, hydraulic ram (not shown) or a similar device. This allows very accurate control of the screeding speed. The screeding speed also will be independent from the speed of the train 10.Using the motion of the train is a little less accurate. In various embodiments the screeds are set to a fixed position on the train 10 and the train movement will provide the screeding operation. At least one of front or primary screed 50 and rear screed or re-screed 52 can be vibrating.
In various embodiments the screed platform comprises manually operated front or primary screed and rear screed or re-screed that move on screed rails previously installed on the tunnel lining to mark the correct concrete level. Two hand winches are welded on posts on both the placement and finishing platform for moving the screeds.
The above described screeds are used as straightedges that are winched or moved along to accurately strike off the concrete. In alternative embodiments roller strikes or twin beam screeds are used. In various embodiments one screed, preferably the rear screed 52, is maintained at a lowered position when the train is moved for leading the concrete level. The platforms and trailers are provided with access decks 45 along sides for operatives to walk to different sections of the train and to have a safe working place.
In various embodiments the invention comprises a device that contains facilities to enable a variety of concrete finishes to be achieved ranging from steel trowelled and exposed aggregate. The device can also remove all wastewater caused by the greencutting process. A range of toppings and curing compounds can also be stored on the train in order to obtain the desired finish.
While certain illustrative embodiments of the invention have been described in particularity, it will be understood that various other modifications will be readily apparent to those skilled in the art without departing from the scope and spirit of the invention. Accordingly, it is not intended that the scope of the claims appended hereto be limited to the description set forth herein but rather that the claims be construed as encompassing all equivalents of the present invention which are apparent to those skilled in the art to which the invention pertains.
标题 | 发布/更新时间 | 阅读量 |
---|---|---|
用于WEB上的定制可缩放动画角色的参数生成的系统 | 2020-11-19 | 0 |
一种带有旋转工作平台的羽毛球制造设备 | 2021-07-12 | 1 |
一种拖布去毛发清洁机 | 2021-08-03 | 1 |
一种PC预制构件运输车及运输车架 | 2021-11-06 | 0 |
一种玻璃检测定位自动传输的加热装置 | 2022-09-05 | 0 |
平板拖把使用方法 | 2021-01-19 | 1 |
一种基于高架库的物料分拣及配送系统的调度方法 | 2020-09-27 | 2 |
产品组装装置和用其制造保险杠护板的方法 | 2022-06-13 | 1 |
一种全自动吸附式上料系统 | 2021-06-29 | 2 |
图像传感器 | 2020-07-10 | 2 |
高效检索全球专利专利汇是专利免费检索,专利查询,专利分析-国家发明专利查询检索分析平台,是提供专利分析,专利查询,专利检索等数据服务功能的知识产权数据服务商。
我们的产品包含105个国家的1.26亿组数据,免费查、免费专利分析。
专利汇分析报告产品可以对行业情报数据进行梳理分析,涉及维度包括行业专利基本状况分析、地域分析、技术分析、发明人分析、申请人分析、专利权人分析、失效分析、核心专利分析、法律分析、研发重点分析、企业专利处境分析、技术处境分析、专利寿命分析、企业定位分析、引证分析等超过60个分析角度,系统通过AI智能系统对图表进行解读,只需1分钟,一键生成行业专利分析报告。