首页 / 专利库 / 建筑材料 / 建筑材料 / 钢管混凝土柱 / Hollow piling method for cast-in-place concrete

Hollow piling method for cast-in-place concrete

阅读:99发布:2023-07-23

专利汇可以提供Hollow piling method for cast-in-place concrete专利检索,专利查询,专利分析的服务。并且PURPOSE: To decrease a processing volume of materials to be carried or displaced by a method wherein the inner part of a pile is made hollow to save a volume of use of concrete and sands and soils are back filled in the hollow part.
CONSTITUTION: Pile hole 1 is excavated up to a specified depth. Cylindrical frames 3 and 4 of small diameter are arranged at a center of section of the pile hole 1, and iron frame or cage 5 is installed in an annular clearance between the pile hole 1 and the cylindrical frames 3 and 4. The cylindrical frames 3 and 4 are made to be a double cylindrical structure covered with a thin walled cylindrical structure 4 having its leading end clogged at an outer circumference of the steel pipe 3. Tremie pipe 6 is inserted into an annular space of the pile hole 1, a floating of the cylindrical frame is restricted and concrete is fed into the hole while the Tremie pipe 6 is pulled up. Upon completion of curing of the concrete, the steel pipe is pulled off with the thin walled cylindrical body 4 being remained to complete a hollow pile. Into the hollow part is fed some excavated soil or mud.
COPYRIGHT: (C)1980,JPO&Japio,下面是Hollow piling method for cast-in-place concrete专利的具体信息内容。

高效检索全球专利

专利汇是专利免费检索,专利查询,专利分析-国家发明专利查询检索分析平台,是提供专利分析,专利查询,专利检索等数据服务功能的知识产权数据服务商。

我们的产品包含105个国家的1.26亿组数据,免费查、免费专利分析。

申请试用

分析报告

专利汇分析报告产品可以对行业情报数据进行梳理分析,涉及维度包括行业专利基本状况分析、地域分析、技术分析、发明人分析、申请人分析、专利权人分析、失效分析、核心专利分析、法律分析、研发重点分析、企业专利处境分析、技术处境分析、专利寿命分析、企业定位分析、引证分析等超过60个分析角度,系统通过AI智能系统对图表进行解读,只需1分钟,一键生成行业专利分析报告。

申请试用

QQ群二维码
意见反馈