首页 / 专利库 / 建筑材料 / 蒸汽养护 / Steel pipe pile and its preparation

Steel pipe pile and its preparation

阅读:699发布:2022-03-23

专利汇可以提供Steel pipe pile and its preparation专利检索,专利查询,专利分析的服务。并且PURPOSE: To heighten the strength of this pile while effectively utilizing slag, by filling converter slag or mortar containing converter slag or concrete into a steel pipe, and by covering both ends with covers in steel with ventilating holes.
CONSTITUTION: A steel pipe 1 is a steel pipe pile corresponding to JISA number 5525. A steel cover 2, to which not less than one ventilating holes 4 with 1W2cmϕ are mounted, is welded to the steel pipe pile, and a bottom is formed. Concrete (Or mortar) fillers 3 containing converter slag are poured from an upper portion of the steel pipe pile vertically erected. The fillers are filled up to an upper surface of the steel pipe pile, and an upper cover 2 is welded, thus making up a filled steel pipe pile. The pile is maintained for a day or two at the normal temperature, held for 3W10 hours at 40W70°C by means of a simple steam curing device or a painting burning device and cured. It is desirable that converter slag used for the fillers are not more than 5mm in diameters when it is employed as a thin aggregate and are not more than 25mm in diameters when it is used as a coarse aggregate.
COPYRIGHT: (C)1980,JPO&Japio,下面是Steel pipe pile and its preparation专利的具体信息内容。

高效检索全球专利

专利汇是专利免费检索,专利查询,专利分析-国家发明专利查询检索分析平台,是提供专利分析,专利查询,专利检索等数据服务功能的知识产权数据服务商。

我们的产品包含105个国家的1.26亿组数据,免费查、免费专利分析。

申请试用

分析报告

专利汇分析报告产品可以对行业情报数据进行梳理分析,涉及维度包括行业专利基本状况分析、地域分析、技术分析、发明人分析、申请人分析、专利权人分析、失效分析、核心专利分析、法律分析、研发重点分析、企业专利处境分析、技术处境分析、专利寿命分析、企业定位分析、引证分析等超过60个分析角度,系统通过AI智能系统对图表进行解读,只需1分钟,一键生成行业专利分析报告。

申请试用

QQ群二维码
意见反馈