首页 / 专利库 / 地热能 / 地热异常 / Steam supply equipment for geothermal turbine

Steam supply equipment for geothermal turbine

阅读:825发布:2020-07-02

专利汇可以提供Steam supply equipment for geothermal turbine专利检索,专利查询,专利分析的服务。并且PURPOSE:To enable the operation of a mixed-pressure geothermal turbine with only primary steam and prevent the abnormality of the turbine blades, by providing a shutoff valve in a by-pass line which connects the primary and secondary steam lines of the turbine to each other. CONSTITUTION:Geothermal steam is divided into primary steam and hot water by a steam and water separator 2. The hot water is changed into secondary steam by a flasher 7. The secondary steam enters into the halfway stage of a turbine 6. To operate the turbine 6 with only the primary steam because of the defectiveness of the flasher 7, a stop valve 15 is entirely closed and another stop valve 14 is opened to supply some primary steam to a secondary steam line 10 so that both the primary steam and secondary steam flow into the turbine 6. As a result, the initial cost of the turbine 6 is prevented from increasing, and the operation of the turbine is continued with only the primary steam so that the turbine blades are not exposed to abnormalities.,下面是Steam supply equipment for geothermal turbine专利的具体信息内容。

高效检索全球专利

专利汇是专利免费检索,专利查询,专利分析-国家发明专利查询检索分析平台,是提供专利分析,专利查询,专利检索等数据服务功能的知识产权数据服务商。

我们的产品包含105个国家的1.26亿组数据,免费查、免费专利分析。

申请试用

分析报告

专利汇分析报告产品可以对行业情报数据进行梳理分析,涉及维度包括行业专利基本状况分析、地域分析、技术分析、发明人分析、申请人分析、专利权人分析、失效分析、核心专利分析、法律分析、研发重点分析、企业专利处境分析、技术处境分析、专利寿命分析、企业定位分析、引证分析等超过60个分析角度,系统通过AI智能系统对图表进行解读,只需1分钟,一键生成行业专利分析报告。

申请试用

QQ群二维码
意见反馈