首页 / 专利库 / 环境工程 / 土工织物 / Cut-off work for fill-dam

Cut-off work for fill-dam

阅读:408发布:2021-09-03

专利汇可以提供Cut-off work for fill-dam专利检索,专利查询,专利分析的服务。并且PURPOSE:To reduce the cost of construction work by a method in which imperfect cut-off zones for forming a core are constructed for each section over the heightwise direction, and a water-impervious geotextile cut-off film is made to cover the slope and top of each section. CONSTITUTION:The first stage section 1A for imperfect cut-off zone is constructed, and sections 2A and 3A for the first stage semi-water permeable zone 2 and water permeable zone 3 are constructed on the downstream side. A geotextile cut-off film 4 is covered on the slope and top of the section 1A, and sections 2A and 3A for the first stage semi-water permeable zone and water permeable zone are constructed on the upstream side of the section 1A. The second stage section 1B is constructed on the section 1A, and sections 2A and 3B for the second stage semi-water permeable zone and water permeable zone are constructed on the downstream side. The film 4 is covered on the slope and top of the section 1B, and its lower end is partly lapped with the film 4 of the section 1A. The second stage semi-water permeable zone and water permeable zone section is constructed on the sections 2A and 3A on the upstream side of the section 1B. The same processes are repeated in order.,下面是Cut-off work for fill-dam专利的具体信息内容。

高效检索全球专利

专利汇是专利免费检索,专利查询,专利分析-国家发明专利查询检索分析平台,是提供专利分析,专利查询,专利检索等数据服务功能的知识产权数据服务商。

我们的产品包含105个国家的1.26亿组数据,免费查、免费专利分析。

申请试用

分析报告

专利汇分析报告产品可以对行业情报数据进行梳理分析,涉及维度包括行业专利基本状况分析、地域分析、技术分析、发明人分析、申请人分析、专利权人分析、失效分析、核心专利分析、法律分析、研发重点分析、企业专利处境分析、技术处境分析、专利寿命分析、企业定位分析、引证分析等超过60个分析角度,系统通过AI智能系统对图表进行解读,只需1分钟,一键生成行业专利分析报告。

申请试用

QQ群二维码
意见反馈