RETROFITTING A HEATING STEAM EXTRACTION FACILITY IN A FOSSIL-FIRED POWER PLANT |
|||||||
申请号 | PCT/EP2011071180 | 申请日 | 2011-11-28 | 公开(公告)号 | WO2012076355A2 | 公开(公告)日 | 2012-06-14 |
申请人 | SIEMENS AG; STIEF GERALD; PICKARD ANDREAS; SCHNEIDER THOMAS; WEIN JOHANNES-WERNER; | 发明人 | STIEF GERALD; PICKARD ANDREAS; SCHNEIDER THOMAS; WEIN JOHANNES-WERNER; | ||||
摘要 | The invention relates to a method for retrofitting an existing steam turbine with a steam extraction facility, wherein the steam turbine comprises a plurality of pressure stages and is integrated into a fossil-fired steam power plant, wherein a steam extraction line is connected to one pressure stage or between two pressure stages of the steam turbine, and a heating steam turbine is connected into the steam extraction line. | ||||||
权利要求 | |||||||
说明书全文 |