STEAM POWER PLANT WITH HEAT RESERVOIR AND METHOD FOR OPERATING A STEAM POWER PLANT

申请号 US13668220 申请日 2012-11-03 公开(公告)号 US20130298558A1 公开(公告)日 2013-11-14
申请人 ALSTOM Technology Ltd; 发明人 Ewald KITZMANN; Volker SCHÜLE; Julia HEINTZ; Benjamin BOND;
摘要 A steam power plant is suggested having, parallel to the low-pressure passage (VW1 to VW2), a heat reservoir (A) which is loaded with preheated condensate in weak-load times. This preheated condensate is taken from the heat reservoir (A) for generating peak-load and inserted downstream of the low-pressure preheater passage (VW1 to VW2) into the condensate line (19.2) resp. the feed water container (8). Thus it is possible to quickly control the power generation of the power plant in a wide range without significantly having to change the heating output of the boiler of the steam generator (1). A steam power plant equipped according to the invention can thus be operated with bigger load modifications and also provide more control energy.
权利要求 1. Steam power plant comprising a steam generator, a turbine, a condenser, a condensate line, at least one low-pressure preheater and a heat reservoir, wherein the condensate line connects the condenser, the at least one preheater and a feed water container with each other, wherein the heat reservoir is arranged parallel to the at least one low-pressure preheater and wherein the heat reservoir is a displacement heat reservoir filled with feed water, wherein the heat exchanger uses steam with a saturated steam temperature higher than the operational temperature of the feed water container.2. Steam power plant according to claim 1, wherein the heat exchanger uses steam from the turbine, steam from the steam generator or auxiliary steam for heating the feed water.3. Steam power plant according to claim 1, further comprising a “cold” connection of the heat reservoir connected with a first section of the condensate line upstream of the at least one low-pressure preheater.4. Steam power plant according to claim 3, wherein the “cold” connection of the heat reservoir is connected with a second section of the condensate line downstream of the at least one low-pressure preheater.5. Steam power plant according to claim 1, further comprising a “warm” connection of the heat reservoir connected with a second section of the condensate line downstream the at least one low-pressure preheater by means of a hot water conduit.6. Steam power plant according to claim 5, wherein the heat exchanger is located at the hot water conduit and the heat exchanger is supplied with steam by means of a steam supply line.7. Steam power plant according to claim 5, further comprising a bypass installed parallel to the heat exchanger.8. Steam power plant according to claim 3, wherein the “cold” connection of the heat reservoir is connected to the condensate line by means of a connecting line and that in a first section and/or in a second section of the connecting line a pump, preferably a speed-controlled pump, is provided.9. Steam power plant according to claim 5, wherein the “warm” connection of the heat reservoir is connected to the condensate line by means of a hot water conduit and a second section of the connecting line.10. Steam power plant according to claim 1, further comprising valves provided in a condensate line, a connecting line, a hot water conduit, a Bypass and/or a steam supply line.11. Steam power plant according to claim 1, further comprising means for control of the feed water level in the heat reservoir.12. Steam power plant according to claim 11, wherein the means for level-regulation are designed as control valves, shutoff devices and/or choke valves.13. Steam power plant according to claim 1, further comprising several serially-connected low-pressure preheaters and the heat reservoir can be connected parallel to one or several of the low-pressure preheaters.14. Method for operating a steam power plant, the method comprising loading the heat reservoir by extracting cold feed water from the “cold” connection of the heat reservoir heating this feed water in the heat exchanger (A) and re-feeding it into the heat reservoir at the “warm” connection.15. Method according to claim 14, further comprising extracting preheated feed water from the condensate line downstream of the at least one low-pressure preheater and that this feed water is further heated in the heat exchanger and re-fed into the heat reservoir at the “warm” connection.16. Method according to claim 14, further comprising uploading the heat reservoir by extracting hot feed water from the heat reservoir and supplying it downstream of the least one low-pressure preheater to the condensate line.17. Method according to claim 16, comprising extracting cold feed water from the condensate line upstream of the least one low-pressure preheater and fed into the heat reservoir at the “cold” connection.
说明书全文

CROSS REFERENCE TO RELATED APPLICATIONS

This application claims the benefit of European Patent Application No.: 11187644.7, filed on Nov. 3, 2011, which is incorporated herein by reference in its entirety.

SPECIFICATION

Conventional steam power plant plants have a closed water-steam cycle. In the steam generator so much energy is added to the boiler feed water by combustion of a fossil fuel that it passes into the vaporous aggregate condition. This steam drives a generator via one or several steam turbines and afterwards is liquefied again in a condenser.

As it is not possible to economically store electric energy in big scope, there were already considerations in the past aiming at storing thermal energy in a steam power plant in order to thereby increase the flexibility resp. adaption to grid requirements (peak load).

It is known from U.S. Pat. No. 4,003,786 to arrange a chain of heat exchangers parallel to the preheater passage of the steam power plant. Via these heat exchangers it is possible to exchange heat between a part of the condensate stream and a thermo-oil. This means that the heat exchangers are streamed through by condensate on the one hand and a thermo-oil on the other hand. Thus it is possible to confer heat from the condensate to the thermo-oil in times of low demand and to store this heated thermo-oil. When subsequently a high output is requested, it is possible to re-confer the heat stored in the thermo-oil to the condensate via the same heat exchangers and thus to reduce the demand of tapping steam for preheating the condensate. Consequently, the output available at the generator is increased and the demanded peak load can be met in a better way.

This known arrangement is very complex and requires a multitude of heat exchangers as well as two heat reservoirs that are operated at different temperatures, i.e. approximately 190° C. and 520° C.

From EP 2 333 254 A1 a steam power plant with a heat reservoir is known. This heat reservoir is loaded with feed water that is tapped from the condensate line upstream of the feed water container.

It is the object of the invention to provide a steam power plant which can provide peak load stream and control energy, wherein the apparative effort required therefore is low. Further on it should be possible to control the electric output within a wide range. Furthermore the retrofit of already existing steam power plants has to be possible in a preferably simple manner and with small manipulations of the steam power plant process.

DISCLOSURE OF THE INVENTION

According to the invention this object is solved by means of a steam power plant comprising the features of claims 1 and 14.

The main advantages achieved by the claimed invention are that the electric output of the power plant is reduced during times with high net load by means of regenerative energies (especially wind and sun), regulating energy is provided and generated, overload capacities are provided and the load curve (balancing of minimums and peaks) is smoothed.

The heat exchanger may use steam with a saturated steam temperature higher than the operational temperature of the heat feed water container. Consequently the hot feed water extracted from the heat reservoir significantly reduces the steam consumption not only of the low-pressure preheaters but also of the preheater in the feed water container. Consequently after a very short time a very high electric output is at disposal. This electric output may even exceed the regular maximum electric output of the power plant. In some cases a plus 10% of electric output could be achieved.

The design of the claimed invention is rather simple and easy to control. It is also suitable as a retrofit solution for existing power plants.

A further advantage of the claimed invention is that the electric output can be reduced to a rather great extent.

As with the steam power plant according to the invention the sensitive heat remains in the condensate and the condensate is temporarily stored in the heat reservoir, the apparative effort is low and the heat losses caused by the temporary storage of the condensate are also very low.

A further advantage of the steam power plant according to the invention is to be seen in that it is also possible to provide control energy by means of the heat reservoir, i.e. by either storing heat in the heat reservoir at short notice corresponding to the present demand or taking it from the heat reservoir.

A further advantage is to be seen in that the steam generator can be operated on a higher partial load level in weak load times and thus with an improved degree of efficiency.

A further very important advantage is to be seen in that even already existing steam power plants can generally be strengthened into a steam power plant according to the invention by integrating a heat reservoir, so that the advantages according to the invention can also be realized in already existing installations.

In further advantageous embodiment of the invention it is provided that a “cold” connection of the heat reservoir is connected with a section of the condensate line extending upstream of the at least one low pressure preheater.

In an analogue manner a “warm” connection of the heat reservoir is connected with a section of the condensate line extending downstream of the at least one preheater.

As a connection of the heat reservoir, i.e. the cold connection, is connected with the condensate line upstream of the preheater(s) and the “warm” connection of the heat reservoir is connected with the section of the condensate line extending downstream of the preheater(s), the cold resp. warm condensate can easily be branched off from the condensate line resp. re-fed at the suitable place. It is also possible, according to the requirement profile of the heat reservoirs, to alternatively optimally control the temperature level of the tapping steam parallel to a preheater, two preheaters or several preheaters corresponding to the disposability at the turbine.

The connection of the heat reservoir according to the invention preferably takes place via a connecting line, wherein in a first section of the connecting line a pump, preferably a speed-regulated, pump is provided. Alternatively or additionally also in the second section of the connecting line a pump, preferably a speed-regulated pump, can be provided. However, use of pumps can/must not be necessary. Pumps can generally be necessary when discharging (hot/cold) the stored condensate in order to convey against existing system pressure. The furnishing of the heat reservoirs takes place via a bypass arranged control valves. The conveyance takes place via existing main condensate pumps.

By means of the at least one pump and the at least one control valve it is possible to exactly control the condensate stream which is branched off from the main condensate line and conveyed into the heat reservoir respectively the quantity of the condensate stream re-fed into the condensate line from the heat reservoir and thus achieve an optimal controllability of the power plant according to the invention. Usually the first section of the connecting line, which connects the condensate line with the cold connection of the heat reservoir, and the second section of the connection line, which connects the warm connection of the heat reservoir with the condensate line, will be constructed symmetrically. Of course non-return valves, shutoff devices etc. can be provided when required and in dependence.

Of course it is also possible, to some extent as emergency option, to provide a choke valve parallel to the control valve, so that in case of breakdown or maintenance of the control valve the operation of the power plant, even with somewhat reduced control quality, can continue without disturbances.

Basically it is possible to construct the pressure reservoir in such a way concerning its pressure resistance that it withstands the pressure given in the condensate lines. Such a reservoir is usually constructed as mere displacement reservoir being 100% filled with condensate. However, from an operational point of view this often is not optimal. For this reason, a heat reservoir being filled with condensate up to only approximately 90% can be used. The remaining 10% are filled up by means of a steam bolster. Wherein control and choke valves have the task of maintaining the mass streams simultaneously supplied and discharged, overlapped by the heat reservoir level to be maintained.

In further advantageous embodiment of the invention it is provided that the steam power plant has several preheaters being connected in series, especially several low-pres sure preheaters, and that the heat reservoir is arranged respectively connected parallel to the one or several of the preheaters. By means of the flexible connection of the heat reservoir either parallel to one, two or a different number of preheaters, the storage capacity of the heat reservoir can be adapted to the requirements and systematically more or less tapping steam from the high-pressure part, the medium-pressure part resp. the low-pressure part of the steam turbine can be provided for preheating the condensate. Thus a further degree of freedom for optimising the operation of the steam power plant is given.

The above-mentioned object is also solved by a method for operating a steam power plant according to independent claim 9. Wherein the advantages according to the invention, as explained in connection with claims 1 to 8, are realized.

Further advantages and advantageous embodiments of the invention can be taken from the following drawing, its specification and the patent claims. All features described in the drawing, its specification and the patent claims can be relevant for the invention either taken by themselves or in optional combination with each other.

FIGURES

FIG. 1 A diagram of a conventional steam power plant,

FIG. 2 an embodiment of a steam power plant according to the invention,

FIG. 3 the steam power plant of FIG. 1 in a first mode of loading,

FIG. 4 the steam power plant of FIG. 1 in a second mode of loading and,

FIG. 5 the steam power plant of FIG. 1 during unloading of the heat reservoir.

SPECIFICATION OF THE EMBODIMENTS

In FIG. 1 a steam power plant fuelled with fossils or biomass is represented as block diagram. FIG. 1 essentially has the purpose of designating the single components of the power plant and to represent the water-steam-cycle in its entirety. For reasons of clarity in the following figures only those parts of the water-steam-cycle are represented which are essential to the invention.

In a steam generator 1 under utilization of fossil fuels or by means of biomass out of the feed water live steam is generated, which is expanded in a steam turbine 3 and thus drives a generator G. Turbine 3 can be separated into a high-pressure part HD, a medium-pressure part MD and a low-pressure part ND.

After expanding the steam in turbine 3, it streams into a condenser 5 and is liquefied there. For this purpose a generally liquid cooling medium, as e.g. cooling water, is supplied to condenser 5. This cooling water is then cooled in a cooling tower (not shown) or by a river in the vicinity of the power plant (not shown), before it enters into condenser 5.

The condensate originated in condenser 5 is then supplied, by a condensate pump 7, to several preheaters VWi, with i=1 n. In the shown embodiment behind the second preheater VW2 a feed water container 8 is arranged. Behind the feed water container 8 a feed water pump 9 is provided.

In combination with the invention it is of significance that the condensate from condenser 5 is preheated with steam beginning with the first preheater VW1 until the last preheater VW5. This so-called tapping steam is taken from turbine 3 and leads to a diminution of the output of turbine 3. With the heat exchange between tapping steam and condensate the temperature of the condensate increases from preheater to preheater. Consequently the temperature as well of the steam utilized for preheating must increase from preheater to preheater.

In the shown embodiment the preheaters VW1 and VW2 are heated with steam from low-pressure part ND of steam turbine 3, whereas the last preheater VW5 is partially heated with steam from high-pressure part HD of steam turbine 3. The third preheater VW3 arranged in the feed water container 8 is heated with steam from medium-pressure part MD of turbine 3.

In FIGS. 2 to 5 various operation conditions of a steam power plant according to the invention are shown. As the invention essentially is concerned with the section of the steam power plant between condenser 5 and the feed water container 8, only this part of the steam power plant is shown in FIG. 2 ff. Neither are, for reasons of clarity, all fittings and components in FIG. 2 ff. designated with reference numerals. The designation of the fittings and representation of the fittings and components corresponds to DIN 2482 “Graphic symbols for heat diagrams”, which herewith is referred to, and are thus self-explanatory. Where obviously identical connections are present several times, partially the insertion of reference numerals is dispensed with in order to maintain the clarity of the figures.

Concerning the parts of the steam power process that are not represented FIG. 1 is referred to. Identical components are designated with identical reference numerals and what is mentioned concerning the other figures correspondingly applies.

In a first section 19.1 of the condensate line 19, a condensate pump 7, a cold water connection 101 and a valve V9 are arranged.

Downstream of the last low-pressure preheater VW2 and upstream of the feed water container 8 a valve V10 and a primary hot water connection 102 are provided.

At the cold water connection 101 a first section 21.1 of a connecting line 21 branches off. The first section 21.1 of the connecting line 21 comprises a valve V1 and is connected with a cold connection 23 of a heat reservoir A.

The heat reservoir A is preferably designed as cylindrical, upright heat reservoir and always filled with condensate (constant reservoir volume). Depending on the operating condition of the heat reservoir installation hot and/or cold condensate is stored in the reservoir. At the upper end (c. f. reference number 27) of the heat reservoir A hot condensate streams in and out and at its bottom (c. f. reference number 23) cold condensate. The filling degree of the heat reservoir A is approximately 90%. Between hot and cold condensate a separating layer exists, occurring due to the density-differences between hot and cold condensate. The temperature-layering in the reservoir is important for the function and efficiency of the heat reservoir installation. Insofar besides adequate loading and unloading devices and corresponding insulation above all the constructive design of the reservoir is to be taken into consideration.

With given volume a heat reservoirs with a great height and consequently a small basis area small surface are preferred, in order to minimize the energy loss by mixing cold and warm condensate inside the heat reservoir. Besides these positive thermodynamic effects as further advantage a low ground requirement is to be noted. The loading condition of the reservoir is determined via temperature measurements being arranged intermittently in the vertical at the heat reservoir casing.

A second section 21.2 of the connecting line connects the cold connection 23 of heat reservoir A with the second part 19.2 of the condensate line 19 at the primary hot water connection 102. The second section 21.2 of the connecting line 21 comprises a pump C. Upstream of the pump C a valve V2 is provided. Downstream of the pump C valve V3 and V4 are provided.

Between the Valve V3 and V4 a second hot water connection 103 is provided. The second hot water connection 103 and a warm connection 27 of heat reservoir A are connected by means of a hot water conduit 29.

In the hot water conduit 29 a valve V5, a heat exchanger B and a valve V6 are installed. The heat exchanger B may be a condensation-heat exchanger with desuperheater and subcooler.

Around the heat exchanger B a bypass D comprising a valve V7 is installed.

The heat exchanger B is supplied with steam from the steam generator 1, especially superheated steam at an appropriate level of temperature and pressure, tapping steam that is tapped from the turbine 3 for example between the high-pressure part HD and the medium-pressure part MD of the turbine. Also auxiliary steam from other sources may be used.

The optimal tapping point depends among other form the temperature of the feed water inside the heat reservoir A when loaded.

The heating steam is connected to the desuperheater of the first heat exchanger B. The condensate of the heating steam is tapped from the desuperheater and at an adequate location (temperature) re-fed into the water-steam-cycle. The condensate can also be discharged into the condenser 5. A valve V8 is arranged in the condensate discharge. A pump (not shown) can also be situated in the condensate discharge.

The valves required by the process have a reference numeral beginning with .“V” as an abbreviation for “Valve” and a number. An open valve is shown as a contour, whereas a closed valve is shown as a black area inside the contour. In FIG. 2 all valves are shown open.

In FIG. 3 a first mode of loading the heat reservoir A is illustrated. It is assumed that the heat reservoir A is filled with cold water of approx. 30° C.

The valves V2, V3, V5, V6, V8, V9, V10 and V11 are open.

The valves V1, V4 and V7 are closed and the pump C is in operation.

The pump C sucks relatively cold condensate (temperature about 30° C.) out of the cold connection 23 of the heat reservoir A and conveys it in the direction of the arrow into the second section 19.2 of condensate line 19, through the secondary hot water connection 103 the hot water conduit 29, the heat exchanger A to the warm connection 23 of the heat reservoir A. In the heat exchanger the temperature of the feed water is raised to an appropriate level of about 180° C. The maximum temperature of the water inside the heat reservoir A may be equal or slightly higher than the temperature of the feed water container 8.

Since no feed water is added or extracted the level of the feed water in the heat reservoir A remains constant.

When loading heat reservoir A a part of the steam produced by the steam generator 1 does not pass the turbine 3 and consequently the electric output of the steam power plant decreases. This means that by loading heat reservoir A the electric output of the steam power plant can systematically and very quickly be reduced, without restricting or adapting the output of the steam generator 1.

In FIG. 4 a second mode of loading the heat reservoir A is illustrated.

The valves V1, V2, V3, V4, V5, V6, V8 V9, V10 and V11 are open. Only valve V7 is closed and the pump C is in operation.

It is assumed that the heat reservoir A is filled with cold water of approx. 30° C. and the mass flows through the low-pressure preheaters VW1, VWA, VWB and VW2 are at maximum.

The steam turbine 3 does not operate at full load so that a part of the feed water can be fed into the heat reservoir A along with some feed water extracted from the heat reservoir at 23.

To make sure that the level of the feed water inside the heat reservoir A remains constant the valve V1 is at least partially open so that some cold feed water from the heat reservoir A streams to the cold water connection 101 and subsequently through the preheaters VW1 to VW2.

This allows a further reduction of the electric output at the Generator G without changing the steam output of the steam generator 1.

In FIG. 5 the unloading is illustrated. The valves V1, V4 and V7 are open. The valves V2, V3, V5, V6, V9, V10 and V11 are closed and the pump C is out of operation.

With this constellation of open and closed valves no feed water streams through the preheaters VW1 to VW2 but the condensate pump 7 conveys feed water from the condenser 5 via the first section 21.1 to the cold connection 23 of the heat reservoir A. This cold feed water pushes hot fed water out of the heat reservoir at the warm connection 27 and via the bypass D to the primary hot water connection 102 and into the feed water container 8. Since the low-pressure preheaters VW1 to VW2 are out of operation they do not consume any no tapping steam and consequently the electric output of the generator G is raised.

Unloading is also possible if a part of the cold feed water flows through the preheaters and an other part of the cold fed water feed water flows through the heat exchanger B.

Since the hot feed water extracted from the heat reservoir A has approximately the same temperature than the feed water container 8 the steam consumption of the preheater VW3 inside the feed water container 8 is reduced to nearly zero. This induces a further raise of the electric output.

The heat reservoir A is constructed as displacement reservoir. That means that it is completely filled with liquid condensate. Cold condensate is located in the lower part of heat reservoir A and the preheated condensate is located in the upper part of heat reservoir A.

It is to be understood that—although this is not explicitly shown in the drawings—it is possible to add low pressure condensers at suitable locations within the arrangement for the connection with district heating means and/or for obtaining process steam.